Welcome Guest

Robust Latch-Up Protection with Schematic Netlist Verification

Authored on: May 30, 2019 by Flint Yoder

Technical Paper

0
More InfoLess Info

Finding and preventing latch-up conditions earlier in the design flow not only helps prevent costly design changes late in the schedule, but also contributes to higher product reliability. Latch-up has long been the cause of grief and frustration for circuit designers. While mitigation solutions exist, they are typically applied after layout, when changes are difficult and time-consuming. Performing topological analysis on the schematic netlist quickly identifies latch-up sensitive scenarios. Designers can then take proactive action during layout to avoid or minimize the creation of susceptible configurations. 


View
 
Please Login

You will be redirected to the login page

×
Please Login

You will be redirected to the login page

×
Please Login

You will be redirected to the login page